Do you want any logistics service, then call us: +86-371-86151827
The company adopts modern management concept, adheres to “quality for survival, integrity for development”, and provides customers with high-quality and reliable corten a steel cost steel products and wholehearted service. The company continuously deepens the internal reform of the enterprise, innovates in the reform, develops in the innovation, and gradually forms a set of management and operation mechanism which adapts to the market and has strong competitiveness.
"Novel coronavirus pneumonia has been closed in recent years, and Pohang iron and Steel Co., Ltd. closed its overseas processing center in Italy, Malaysia, Philippines and India. At the request of the Italian government, all production activities will be stopped except for the necessary corten a steel cost products. POSCO-ITPC, an Italian stainless steel cold rolling mill near Verona in northeast Italy, is scheduled to close from March 26 to April 3. The center has an annual processing capacity of 40000 tons of corten a steel cost stainless steel processing plant. POSCO-MKPC in Malaysia and POSCO-PMPC in the Philippines have been closed on March 17 and 18 respectively, and will be closed to the end of March. In addition, POSCO's rolling plate processing center in India will also be closed to March 31 as instructed by the local government of India."
Flat corten a steel cost steel plate, with a small thickness of the plate. Low carbon equivalent, to adapt to automatic submerged arc welding, plasma welding and other corten a steel cost welding process requirements.
The large diameter cold drawn seamless steel pipe is a steel pipe with an outer diameter of more than 1000mm. The large diameter seamless steel pipe is made of steel ingot or solid billet through perforation and then hot rolling, cold rolling or cold drawing. If they are long, they need to remove the redundant parts, that is, cut them out. Their length corten a steel cost is suitable for the length required by the construction of steel pipes.
Box making, door-to-door: fill in the packing plan: box making time, ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, door point, contact person, telephone number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date). Internal loading: fill in the packing plan: ship name, voyage number, customs declaration number, transfer port, destination port, gross weight, number of pieces, volume, cabin number, etc., and arrange the train shift 1-2 days before the closing date (two days before the ship's date).
Ask for the instant quotation