Do you want any logistics service, then call us: +86-371-86151827
The company has allocated special environmental protection facilities for all q355gnh size and structure pollution sources, strengthened the recycling of waste resources and improved the efficiency of resource utilization. At present, the recovery and utilization rate of solid wastes such as iron slag, steel slag, iron bearing dust, q355gnh size and structure steel mill scale, environmental protection dust has reached 100%.
The steel plate used for containers and pressure vessel has to bear different pressures and strengths due to the manufactured containers. The normal pressure is generally 31.4MPa or higher; the working temperature is usually between -20 ℃ -450 ℃, and sometimes lower than -20 ℃. According to the working conditions and processing technology of the container, the q355gnh size and structure, steel plate used for the container must have good cold bending and welding performance. Besides, it should have good plasticity and toughness, high temperature short-term strength or long-term strength performance.
our company supplied 2300 ton API 5L GrB ERW pipe to Petroleum company in 2016. It takes 35 days for our company to finish all the production according to API 5L standard. The products are used to drilling , gas transmission works. And we supply the API5L PSL1 GR B original Mill Test Certificate, API5L PSL1 GR B pipes picture, the dimension test, the q355gnh size and structure material, heat number, supplier name and size will be shown on the surface of steel pipe.
The trend of international shipping development of large-scale ships and strategic joint ventures puts forward higher requirements for modern ports. Modern ports no longer use the general cargo throughput as a measure sign, and container throughput will become the main sign to measure the role and status of modern ports. The average container capacity in 2000 is 3200teu, and it is expected to be 5500teu in 2020.
The after-sales service department will pay return visit to each customer by call or email, report problems found during the return visit in time, and discuss with the production and quality inspection center to propose effective solutions and follow up in a timely manner, so as to ensure the benefits each customer are fully guaranteed, and to provide customers with more value-added services.
Ask for the instant quotation