Do you want any logistics service, then call us: +86-371-86151827
The company is a large a537 class 1 steel for bridge construction steel supplier and exporter specializing in steel coil, steel plate, steel tube and section steel. The company has always put service and quality first, offered reasonable price, taken small profits and quick turnover as the principle, honest and trustworthy as the purpose. The success of the company is not only the hard work and wisdom of all the employees of the company, but also the deep love of our customers. We will continue to achieve new leaps and create greater brilliance of the a537 class 1 steel for bridge construction enterprise, and make our own contribution to the development of the world economy.
The company has a group of experienced steel plate continuous processing line construction, production management, operation and professional and technical personnel. The company is a modern enterprise integrating scientific research and development, production processing, sales and service. Our main products include hot rolled plates, seamless pipes, a537 class 1 steel for bridge construction and steel structures. At the same time, it also adheres to international standards and adheres to the international line.
If a destructive accident occurs during the use of the boiler, it will cause serious losses. Therefore, other than some common strengths with a537 class 1 steel for bridge construction, the boiler steel plate must have good physical properties, mechanical properties and workability, and be strictly specified in the technical terms of the material standard to meet its safety in use. High temperature (above creep temperature) boiler steel plates are generally low-alloy heat-resistant steels, such as chromium molybdenum steel, chromium molybdenum vanadium steel, chromium molybdenum tungsten steel, etc.
Preheating cutting: The most effective way to prevent steel plate cutting cracks is to preheat before cutting. Before flame cutting, the steel plate is usually preheated, and the preheating temperature mainly depends on the quality level and thickness of the steel plate. The preheating method can be carried out with flame burner, electronic heating pad, or heating furnace. In order to determine the preheating effect of the steel plate, the required temperature should be tested at the heating point.
We cooperated with the Peruvian government for many years. And supply them large diameter steel pipes and pipe fittings to support their Hydropower Station Projects. We do 100% UT, RT, Hydraulic test and so on tests for the a537 class 1 steel for bridge construction steel pipes. And do PT, MT and so on tests for the pipe fittings. We published "Welding Procedure Qualification report" after production. And our mill will keep the test record in the documentary department for 5 years. If meet any problems in following application, we can check the test record easily and assist to solve problems at the first time.
Enterprise mission: to create value added steel products a537 class 1 steel for bridge construction and provide first-class serviceWe are committed to quality. It is to firmly establish the concept that quality is the life of an enterprise, and make it clear that quality is the decisive factor for the survival and development of an enterprise. Adhere to the quality brand strategy and strive to improve the comprehensive competitiveness with quality as the core.Core values of the enterprise: innovation, dedication and transcendence. It is a highly refined spiritual quality to our staff.
Ask for the instant quotation