Hot rolled technology of A588 Grade A tower steel

home > News

Hot rolled technology of A588 Grade A tower steel

Pressure vessel steel SA204GrA, SA204GrB, SA204GrC sheet delivery status: normalized rolling, maybe normalized, or other heat treatment methods may be negotiated with users for delivery. Generally, the thickness of the A588 Grade A tower steel, ASME SA204 pressure vessel steel plate is ≤40mm, and it is generally delivered in the rolled state, and the SA204GrA steel plate of more than 40mm can be delivered in the normalized heat treatment state.

The company produces seamless steel pipes such as GB, ASTM, etc. all year round, including low and medium pressure boiler steel pipes, high pressure boiler steel pipes, A588 Grade A tower steel seamless steel pipes for ships and petroleum cracking A588 Grade A tower steel steel pipes, Seamless steel pipe, oil sleeve steel pipe, pipeline steel pipe, hollow sucker rod, common fluid steel pipe, structural pipe, kauden steel pipe, seawater corrosion-resistant titanium pipe and imported alloy steel pipe are used for high-pressure fertilizer equipment. The products are widely used in petroleum, chemical, electric, boiler, ship, machinery and other industries, and have been sold all over the country. Many A588 Grade A tower steel products have been exported to the Middle East, India, Southeast Asia and Europe and America.

Normalizing is to heat the steel parts to 30~80℃above the critical temperature for a period of time. Then the parts are taken out of the furnace and cooled in air. Since the cooling rate of normalizing is faster than that of annealing, the strength and hardness of normalized A588 Grade A tower steel are higher than that of annealed A588 Grade A tower steel, but the elimination of internal stress is not as good as annealing. The normalizing operation of A588 Grade A tower steel is simple, the cost is low, the productivity is high, and it is widely used in actual production.

After extrusion, the A588 Grade A tower steel tube shall be removed for sizing. The sizing machine uses a cone-shaped bit to rotate into the steel embryo at high speed to drill holes to form steel pipes. The inner diameter of the steel pipe is determined by the outer diameter length of the drill bit of the sizing machine. After sizing, the steel pipe will enter the cooling tower and be cooled by water spray. After cooling, the steel pipe will be straightened. After straightening, the steel pipe is sent to the metal flaw detector (or hydraulic test) by the conveyor belt for internal flaw detection.

The company strengthens process management and pays attention to assessment. One of the key points of good service is to strengthen the process management and improve the evaluation mechanism. Make the after-sales service system more perfect and provide better service for customers.

Ask for the instant quotation