Do you want any logistics service, then call us: +86-371-86151827
For the estimation in April and the second quarter, the estimation on March 16 is still valid, but the decrease in April is 10% higher than the neutral prediction. It is a conservative estimation based on 10% for the high probability event. In the second quarter, the output of overseas pig iron will be reduced by 11.67 million tons, affecting the demand for q355gnh steel yield iron ore of about 1.84 million tons; in the first half of the year, the output will be reduced by 18.899 million tons, affecting the demand for iron ore of 32.13 million tons.
It is very important for an enterprise to have a sound after-sales service system, which not only ensures the normal outflow and inflow of the company's products, but also improves the trust of the company's products in the hearts of customers. Our company has a special after-sales service team and good after-sales service reputation. In case of any problem in the use of our steel products q355gnh steel yield , whether quality problem or not, the after-sales service department will assist in solving the problem as soon as possible, and regularly consult and track the use of the steel products.
Bridge steel q355gnh steel yield is required to have higher strength, toughness, load and impact of rolling stock, and good fatigue resistance, low temperature toughness and atmospheric corrosion resistance. With the development of domestic railway construction towards high speed and heavy load, railway bridge steel developing in the direction of high speed, heavy load, long span, beautiful and novel structure, and full welding, higher requirements are imposed on the properties of steel for bridges. In particular, the development of cross-sea bridges has put forward higher requirements on the corrosion resistance of steel for bridges.
Steel transportation because of the special material of q355gnh steel yield steel, is a metal with "iron" as the main basic element, small volume and large weight, and easy to oxidize and rust when contacting with air and rain water, so there are many precautions in the transportation of steel. There are 11 proverbs for steel transportation: "evenly placed, moisture-proof and rust proof". Our company chooses the logistics aspect to be very rigorous, takes the customer's request as the standard, guarantees the steel product quality.
Alloy elements have the most significant strengthening effect on steel in quenched and tempered state. The primary purpose of adding alloying elements to steel is to improve the hardenability of steel and to ensure that martensite is easily obtained during quenching. The second is to improve the tempering stability of the steel to keep the martensite at a higher temperature, so that the carbides precipitated during the tempering of the quenched steel are finer, uniform and stable. In this way, under the same conditions, alloy steel has higher strength than carbon steel, q355gnh steel yield.
We have replenish steel materials stocks, now there are huge stocks of S355JR, A36, q355gnh steel yield A572 Gr 50, 16Mo3, A516 Gr 70, ABS grade A, AH32, AH36, EH36, SPA-H, SG295,SM700C etc steel materials. We can arrange delivery for those stock steel products within short time. Meanwhile, we also provide further processing for the q355gnh steel yield steel materials, such as cutting, drilling, bending, welding, etc. Please do not hesitate to contact us if you have any steel demands.
If customers have any difficult problems during use of the steel materials, they can contact the company's after-sales service department to feedback the existing problems. The after-sales department will reply as soon as possible to ensure that each customer has a good after-sales experience. Under special circumstances, the after-sales service department will start the problem-solving process, and the engineers in charge of the area will quickly follow up to solve the problem.
Ask for the instant quotation