Do you want any logistics service, then call us: +86-371-86151827
The company has a group of mature steel plate production and processing line construction and production management experience. In addition, the company has professional and technical personnel. BBN steel is a modern enterprise integrating scientific research and development, production processing, sales and service. The company now has finance department, production department, sales team, technical department, quality control department, logistics department and after-sales service team. At the same time, it also adheres to international standards and adheres to the international line.
Good weldabilityBecause of its low carbon content, low alloy element content, good plasticity and low hardenability, this material Corten A sheets spot is not suitable to have quenching structure or crack at the weld. The cold and hot pressure processing performance is good. Because of its good plasticity and small deformation resistance, it is not easy to produce cracks after pressure processing. Good corrosion resistanceUnder various atmospheric conditions, it has higher corrosion resistance than carbon steel.
Boiler steel Corten A sheets spot inventory: 14*2000*11181, 14*2070*9060, 14*2200*10030, 15*2200*10270, 15*2500*10000, 15*2992*10185, 16*1500*9340, 16*1800*6000, 16*2000*10713, 16*2120*6080, 16*2230*7650, 18.5*2320*6600, 20*1400*11400, 20*2100*7000, 20*2933*7300, 20*3200*4400, 20.9*2851*7000, 21*2100*8810, 21.5*1630*13480.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
Ask for the instant quotation